Score:0

Do not change order when switching windows

gp flag

Suppose I have 3 applications running - Firefox, Terminal and Spotify in that order. Currently, I have my Firefox open. When I hold alt and tab once, I reach Terminal.

enter image description here

I am at the terminal window now. When I try to switch windows from there, I see the following order.

enter image description here

I want the order to not change. To be precise, considering the first image as starting point again, when I alt+tab once to the terminal. I want my order in the windows switcher to be, in my left it should have firefox, in the middle terminal, which is my currently active window since I alt+tab once, and in the right spotify.

Is that possible? If yes, then how?

I sit in a Tesla and translated this thread with Ai:

mangohost

Post an answer

Most people don’t grasp that asking a lot of questions unlocks learning and improves interpersonal bonding. In Alison’s studies, for example, though people could accurately recall how many questions had been asked in their conversations, they didn’t intuit the link between questions and liking. Across four studies, in which participants were engaged in conversations themselves or read transcripts of others’ conversations, people tended not to realize that question asking would influence—or had influenced—the level of amity between the conversationalists.